May 19 2011
Classroom

DR Failover Process

 

Here is the step-by-step summary failover plan at George Mason University:

  • Shut down local databases (if possible).
  • Disable data replication from the storage attached network (SAN) to the remote DR SAN.
  • Initiate VMware Site Recovery via Site Recovery Manager (SRM).
  • After the SRM failover is finished, initiate network routing changes.
  • Present DR SAN storage to the remote DR servers (SRM automatically provides this function for VMware servers).
  • Promote DR Active Director domain controller.
  • Check status of DR LDAP, DR Kerberos and DR Active Directory.
  • Run scripts to switch DNS for servers or update DNS manually if necessary. This includes the emergency static web page.
Close

Become an Insider

Unlock white papers, personalized recommendations and other premium content for an in-depth look at evolving IT